@ -60,13 +60,13 @@ Install the Top Track: Secure the top track to the wall using screws. Ensure it
@@ -60,13 +60,13 @@ Install the Top Track: Secure the top track to the wall using screws. Ensure it
Step 4: Prepare the Door Panels
Attach Hinges: Depending on the design, attach the hinges to the door panels as per the manufacturer’s instructions.
Attach Hinges: [Window Replacement Harpenden](https://www.influencersgonewild.co.uk/blog/home-improvement-4/cost-vs-benefit-the-economics-of-window-replacement-in-harpenden-773) Depending on the design, attach the hinges to the door panels as per the manufacturer’s instructions.
Install Bottom Track: Mark and install the bottom track on the floor, ensuring it aligns with the top track. Use a level to confirm proper alignment.
Step 5: Hang the Door Panels
Position the Panels: Lift the first door panel into place [Windows by Ideal Glass](https://ttm.media/business/ideal-glass-backs-armed-forces-day-while-serving-homes-in-st-albans/) inserting the top pivots into the top track.
Position the Panels: Lift the first door panel into place by inserting the top pivots into the top track.
Secure the Bottom: Align the bottom pivot with the bottom track and secure it in place.